Case Studies
Energy Efficiency
The Highfield Hotel – Commercial boiler replacement
About the client:
The Highfield Hotel is a busy hospitality hot spot just outside of Durham. Hosting luxury rooms of varying sizes and a popular Thai restaurant, the Star of Siam, this hotel is ideally located for business trips, family staycations, and short leisure breaks for individuals.
Project background:
With pressure to provide exceptional service for visiting customers and stay ahead of local competition, this client required a reliable building engineering service to update their heating systems quickly and seamlessly.
Through dedicated ongoing investment in the hotel, the property owner is ensuring that the systems and latest installations are working at maximum efficiency, which will ultimately lower the cost of repairs, replacements, and issues in the future.
Project solution and outcome:
For this product, our engineers replaced an out-of-date, inefficient floor-standing boiler, with a new state-of-the-art, wall-hung Atag boiler. This latest installation was then followed by a low-loss header, magnetic filtration system, and added expansion vessel.
With this commercial boiler replacement, the Highfield Hotel can now confidently provide the best service and keep its premises running efficiently for guests and staff alike. commercial boiler replacement